A part can't move to the next station until the previous gate is signed off — and every gate writes to the batch record.
Parts counted, inspected and lot-tagged against the PO and drawing revision.
Cleaning and surface prep, with bath chemistry verified before the load goes in.
Rectifier programmed per load by our software — surface area calculated, current profile logged.
Film thickness, seal quality and visual checks against the governing specification.
CoC signed, doc pack compiled, parts packed and dispatched — records retained.
The facility was designed from day one to the operational requirements of AC7108 — the NADCAP audit criteria for chemical processing — from tank layout and solution control to record retention.
NADCAP certification is targeted for 2027.